Critical analysis of the «new» Italian capacity remuneration mechanism

P. Mastropietro, F. Fontini, P. Rodilla, C. Batlle

2nd AIEE Energy Symposium «Current and Future Challenges to Energy Security», Roma (Italia). 02-04 noviembre 2017


Resumen:
Italy is currently finalising the design of its capacity remuneration mechanism. The provisional capacity payment, introduced in 2004, is to be replaced by a market-wide reliability option scheme. This paper provides an in-depth description of the Italian mechanism and presents a critical analysis of its design.


Palabras clave: Capacity Remuneration Mechanisms; Reliability options; Resource adequacy; Flexibility; Design elements; Italy


Fecha de publicación: 02-nov-2017


Cita:
P. Mastropietro, F. Fontini, P. Rodilla, C. Batlle, "Critical analysis of the «new» Italian capacity remuneration mechanism", presentado en 2nd AIEE Energy Symposium «Current and Future Challenges to Energy Security», Roma, Italia, 02-04 noviembre 2017

    Líneas de investigación:
  • Diseño y regulación de mercados energéticos
    Grupos de investigación:
  • Instituto de Investigación Tecnológica (IIT)

IIT-17-137A_abstract