2nd AIEE Energy Symposium «Current and Future Challenges to Energy Security», Roma (Italia). 02-04 noviembre 2017
Resumen:
Italy is currently finalising the design of its capacity remuneration mechanism. The provisional capacity payment, introduced in 2004, is to be replaced by a market-wide reliability option scheme. This paper provides an in-depth description of the Italian mechanism and presents a critical analysis of its design.
Palabras clave: Capacity Remuneration Mechanisms; Reliability options; Resource adequacy; Flexibility; Design elements; Italy
Fecha de publicación: 02-nov-2017
Cita:
P. Mastropietro, F. Fontini, P. Rodilla, C. Batlle, "Critical analysis of the «new» Italian capacity remuneration mechanism", presentado en 2nd AIEE Energy Symposium «Current and Future Challenges to Energy Security», Roma, Italia, 02-04 noviembre 2017